Construction Updates for November 2016

November 2016

November 11, 2016

Thank you for your interest in the Tangerine Road improvements.

  • On Monday, November 14, from 6 a.m. to 11 a.m., the contractor will be installing waterlines along Tangerine Road at La Cholla Boulevard. The traveling public and residents can expect the following traffic control:
  • Northbound and southbound traffic on La Cholla Boulevard will be shifted to the east. One through lane will be maintained in each direction.
  • No left turns will be permitted from northbound or southbound La Cholla Boulevard at Tangerine Road.
  • Right turns will be permitted on La Cholla Boulevard at Tangerine Road.
  • The speed limit will be reduced to 25 MPH.

On Monday, November 14, from 11 a.m. to 4 p.m., the contractor will be installing waterlines along Tangerine Road at La Cholla Boulevard. The traveling public and residents can expect the following traffic control:

  • Northbound and southbound traffic on La Cholla Boulevard will be shifted to the west. One through lane will be maintained in each direction.
  • No left turns will be permitted from northbound or southbound La Cholla Boulevard at Tangerine Road.
  • Right turns will be permitted on La Cholla Boulevard at Tangerine Road.
  • The speed limit will be reduced to 25 MPH.

Beginning Monday, November 14, through Tuesday, November 15, from 7 a.m. to 4 p.m. each day, the contractor will install drainage facilities on Camino de Oeste at Tangerine Road. The traveling public and residents can expect the following:

  • North and southbound Camino de Oeste will be reduced to one lane of travel. Flaggers will be on-site to direct alternating travel in each direction.
  • Expect slight delays.
  • Speed limit is 25 MPH.

November 8, 2016

On Wednesday, November 9, from 6 a.m. to 2 p.m., the contractor will be potholing along Tangerine Road at La Cholla Boulevard. The traveling public and residents can expect the following traffic control:

  • Westbound and eastbound traffic on Tangerine Road will be shifted to the south. One through lane will be maintained in each direction.
  • No left turns will be permitted from westbound or eastbound Tangerine Road at La Cholla Boulevard.
  • Right turns will be permitted on Tangerine Road at La Cholla Boulevard.
  • The speed limit will be reduced to 25 MPH.

On Thursday, November 10, from 7 a.m. to 4 p.m., the contractor will be installing waterlines along Tangerine Road at La Cholla Boulevard. The traveling public and residents can expect the following traffic control:

  • Northbound and southbound traffic on La Cholla Boulevard will be shifted to the east. One through lane will be maintained in each direction.
  • No left turns will be permitted from northbound or southbound La Cholla Boulevard at Tangerine Road.
  • Right turns will be permitted on La Cholla Boulevard at Tangerine Road.
  • The speed limit will be reduced to 25 MPH.

**Reminder**
Beginning tonight at 10 p.m., traffic will be shifted on Tangerine Road between Camino de Oeste and Thornydale Road to help facilitate the construction of the new alignment of Tangerine Road. This traffic control is scheduled to be in place for the next several months.


November 4, 2016

Beginning 10 p.m., Tuesday, November 8, traffic will be shifted on Tangerine Road between Camino de Oeste and Thornydale Road to help facilitate the construction of the new alignment of Tangerine Road. This traffic control is scheduled to be in place for the next several months.

The traveling public and residents can expect the following:

  • Police will be on-site Tuesday, November 8, and Wednesday, November 9 from 8 p.m. to 5 a.m. each night to help direct traffic in the area
  • The speed limit will be reduced to 25 mph on Tangerine Road from just west of Twin Peaks Road/Dove Mountain Boulevard to Thornydale Road.
  • One lane of travel will be maintained in each direction. There will be temporary striping that indicates travel lanes on Tangerine Road.
  • Temporary concrete barriers will be placed between the construction area and the travel lanes.
  • At the intersection of Twin Peaks Road/Dove Mountain Boulevard and Tangerine Road, north and southbound Twin Peaks Road/Dove Mountain Boulevard will be reduced to one lane in each direction.
    • A dedicated left turn lane onto Tangerine Road will be provided in each direction.
    • East and westbound traffic will be shifted onto the newly placed pavement on the northwest corner of the intersection.
  • Please be cautious while driving around temporary traffic control.
  • The current configuration from Twin Peaks Road/Dove Mountain Boulevard to Camino De Oeste will stay in place.

‹ Return to Construction Updates

Tangerine Road
  • Tangerine Road Project c/o 100 N Stone Avenue, Ste. #450
  • Tucson, AZ 85701
  • Phone: 520.623.3073